- Region
- Águilas
- Alhama de Murcia
- Jumilla
- Lorca
- Los Alcázares
- Mazarrón
- San Javier
-
ALL AREAS & TOWNS
- AREAS
- SOUTH WEST
- MAR MENOR
- MURCIA CITY & CENTRAL
- NORTH & NORTH WEST
- TOWNS
- Abanilla
- Abarán
- Aguilas
- Alamillo
- Alcantarilla
- Aledo
- Alhama de Murcia
- Archena
- Balsicas
- Blanca
- Bolnuevo
- Bullas
- Cañadas del Romero
- Cabo de Palos
- Calasparra
- Camping Bolnuevo
- Campo De Ricote
- Camposol
- Canada De La Lena
- Caravaca de la Cruz
- Cartagena
- Cehegin
- Ceuti
- Cieza
- Condado de Alhama
- Corvera
- Costa Cálida
- Cuevas De Almanzora
- Cuevas de Reyllo
- El Carmoli
- El Mojon
- El Molino (Puerto Lumbreras)
- El Pareton / Cantareros
- El Raso
- El Valle Golf Resort
- Fortuna
- Fuente Alamo
- Hacienda del Alamo Golf Resort
- Hacienda Riquelme Golf Resort
- Isla Plana
- Islas Menores & Mar de Cristal
- Jumilla
- La Azohia
- La Charca
- La Manga Club
- La Manga del Mar Menor
- La Pinilla
- La Puebla
- La Torre
- La Torre Golf Resort
- La Unión
- Las Palas
- Las Ramblas
- Las Ramblas Golf
- Las Torres de Cotillas
- Leiva
- Librilla
- Lo Pagan
- Lo Santiago
- Lorca
- Lorquí
- Los Alcázares
- Los Balcones
- Los Belones
- Los Canovas
- Los Nietos
- Los Perez (Tallante)
- Los Urrutias
- Los Ventorrillos
- Mar De Cristal
- Mar Menor
- Mar Menor Golf Resort
- Mazarrón
- Mazarrón Country Club
- Molina de Segura
- Moratalla
- Mula
- Murcia City
- Murcia Property
- Pareton
- Peraleja Golf Resort
- Perin
- Pilar de la Horadada
- Pinar de Campoverde
- Pinoso
- Playa Honda
- Playa Honda / Playa Paraíso
- Pliego
- Portmán
- Pozo Estrecho
- Puerto de Mazarrón
- Puerto Lumbreras
- Puntas De Calnegre
- Region of Murcia
- Ricote
- Roda Golf Resort
- Roldan
- Roldan and Lo Ferro
- San Javier
- San Pedro del Pinatar
- Santiago de la Ribera
- Sierra Espuña
- Sucina
- Tallante
- Terrazas de la Torre Golf Resort
- Torre Pacheco
- Totana
- What's On Weekly Bulletin
- Yecla
- EDITIONS:
Spanish News Today
Alicante Today
Andalucia Today
Date Published: 30/07/2025
New desalination plants planned for Águilas and Torrevieja to increase water supply in Murcia and Alicante
These major infrastructure projects aim to ease groundwater pressure and provide more fresh water for the area

Two large desalination projects are moving forward in Águilas and Torrevieja, with the Confederación Hydrográfica del Segura (CHS) preparing to tender preliminary construction plans.
Together, the two plants are expected to produce up to 150 cubic hectometres (hm³) of desalinated water per year – 50hm³ from Águilas and 100hm³ from Torrevieja – and will tackle two key challenges: the shortage of water for irrigation and the overuse of groundwater in areas linked to the Tagus-Segura Transfer canals.
The Águilas facility will serve the southwest of the Region of Murcia and parts of Almería province, while the Torrevieja plant will mainly supply the province of Alicante and the Campo de Cartagena.
The CHS has divided the tender into two parts. The first covers the Águilas project with a budget of €876,083, and the second, Torrevieja, with €960,662. The total budget is just over €1.8 million, with the planning phase expected to last one year.
In Águilas, the desalinated water will be split into two uses. Around 33.5hm³ will relieve pressure on overused aquifers in areas such as Sierra Espuña, Bajo Guadalentín, Mazarrón and Bullas. A further 16.5hm³ will be used to supply towns including Pliego, Lorca, Librilla, Alhama de Murcia, Totana, Sangonera and parts of Almería. The project also plans to address water needs in Pantano de la Cierva, Puebla and Yéchar.

Meanwhile, the Torrevieja plant will produce 58.5hm³ to support irrigation in areas like Campo de Cartagena, Albatera and La Pedrera, with 52.7hm³ delivered directly and 5.8hm³ via swap. An additional 41.5hm³ will go toward replenishing overexploited groundwater sources such as Cabo Roig and Vega Alta del Segura.
Exact locations for the new plants are yet to be confirmed. However, it is known that Águilas’ facility will be built on the southern coast of the Region of Murcia, and Torrevieja’s plant is expected to be near the La Pedrera reservoir. Both will be connected to existing desalination facilities and powered by dedicated solar energy systems.
The infrastructure will also include pipelines, pumps, reservoirs and electrical lines to integrate the new plants into the current water supply network.
Images: CHS
staff.inc.ali
Loading
See more environmental news about Spain:
OR
Sign up for the Spanish News Today Editors Roundup Weekly Bulletin to get a comprehensive email with all the week’s news for Spain, Murcia, Alicante and Andalucía.
Get a sneak peek – here are a few of our recent Subscription Bulletins:
Discount Special Offer subscription:
36.95€ for 48 Editor’s Weekly News Roundup bulletins!
Please CLICK THE BUTTON to subscribe.
Contact Murcia Today: Editorial 000 000 000 /
Office 000 000 000